Building Permits
To date, we have no information about building permits in 2025
Jul 22, 2016
Description: Installation of a sig com radio box internal per easton fire department requirements
- Contractor: Sounder Systems Inc
- Fee: $290.00 paid to Town of Easton, Massachusetts
- Client: Atlantic Dracut Realty Lmtd
- Permit #: E-16-0467
Dec 17, 2014
Description: Preform make safe demolition of existing office. furnish and install new light fixtures and switches
- Contractor: Interstate Electrical
- Fee: $160.00 paid to Town of Easton, Massachusetts
- Client: Atlantic Dracut Realty Lmtd
- Permit #: E-14-0150
Dec 15, 2014
Description: Installation of 2 horn/strobes to the existing fire alarm system
- Contractor: Sounder Systems Inc
- Fee: $75.00 paid to Town of Easton, Massachusetts
- Client: Atlantic Dracut Realty Lmtd
- Permit #: E-14-0144
Dec 2, 2014
Description: Within a 5,000 sf section of the building demolish all interior partitions except for existing bathrooms. do appropriate electrical demolition and sprinkler head reconfiguration to meet fire code
- Contractor: K M Construction Inc
- Fee: $255.00 paid to Town of Easton, Massachusetts
- Client: Atlantic Dracut Realty Lmtd
- Parcel #: 34U-5B
- Permit #: C-14-0194
Feb 24, 2009
Description: Reno exstg bldg-1 story-15,392sf--15-20 employees;30 parking spaces provided;demo of exstg interior;construct new partitions for new print rm,break rm,offices, bthrms & warehse.new electrical,plumbg,fire sprinkler&other finishes;new mechanical (rtus)-separate permits required.note:design professionals shall provide inspections at appropriate intervals. final reports required of design professionals & contractor. shutdown of fire protection systems requires notification to fire chief
- Fee: $9,750.00 paid to Town of Easton, Massachusetts
- Client: Atlantic Management
- Parcel #: 34U-5B
- Permit #: 12087
Norfolk Ave Fire Incident History
To date, we have no information about fire incidents in 2025
31 Mar 2014
Building fires
Property Use —
Manufacturing, processing
Area of Origin —
Processing/manufacturing area, workroom
First Ignition —
Flammable liquid/gas - in/from final container
Heat Source —
Radiated, conducted heat from operating equipment
21 Feb 2009
Building fires
Property Use —
Warehouse
Area of Origin —
Computer room, control room or center
First Ignition —
Electrical wire, cable insulation
Heat Source —
Arcing
11 Aug 2006
Building fires
Property Use —
Manufacturing, processing
Area of Origin —
Maintenance shop or area, paint shop or area
Norfolk Ave Incidents registered in FEMA
(Federal Emergency Management Agency)
To date, we have no information about incidents registered in FEMA in 2025
18 Mar 2015
Gas leak (natural gas or LPG)
Property Use —
Manufacturing, processing
21 Feb 2015
Gas leak (natural gas or LPG)
Property Use —
Warehouse
28 Oct 2014
Gas leak (natural gas or LPG)
Property Use —
Manufacturing, processing
28 Oct 2014
Gas leak (natural gas or LPG)
Property Use —
Manufacturing, processing
Properties Nearby
| Street Address | Residens/Landlords | |
|---|---|---|
| Air Energy, LLC, Debra Foster |